Europe based- Upscale plant

Predictive Performance
Greenfield project – 500kW

https://sgtech.co.il/wp-content/uploads/2022/03/bnr-use-cases.png

• To be established in 2022
• 1200 dairy cows
• Manure Capacity – 48,000 ton/y
• Input – cattle slurry, cattle dung
• Biogas production – 190 m /h
• Methane concentration – 65%
• Biomethane production – 125 m /h
• Biogas yield -0.45 m /kg oDM
• TN liquid digestate – 350 mg/l
(65% removal w/w)
• TP liquid digestate – 150 mg/l
(60% removal w/w)